Hi all just found this site and thought I would ask the experts here about an issue we have with our builder.
We started a new pool construction in the beginning of December and ran across an issue due to the soft soil. Basically the crew came out and started to dig but then realized the ground was too soft/wet for the heavy excavator. They thought they would have to use a bobcat. They waited about 3 weeks mainly due to holidays and demand for excavators. Finally restarted Jan 7th with the same heavy excavator but checked the soil this time by running their pickup truck over the area.
The issue I’m having is they want to charge me a pull off fee of about $1000 for the initial failed dig. I’m just wondering if this is normal and shouldn’t the company known to assess the soil prior to dig?
Thanks in advance for any advice.
Here’s our pool design for those interested

We started a new pool construction in the beginning of December and ran across an issue due to the soft soil. Basically the crew came out and started to dig but then realized the ground was too soft/wet for the heavy excavator. They thought they would have to use a bobcat. They waited about 3 weeks mainly due to holidays and demand for excavators. Finally restarted Jan 7th with the same heavy excavator but checked the soil this time by running their pickup truck over the area.
The issue I’m having is they want to charge me a pull off fee of about $1000 for the initial failed dig. I’m just wondering if this is normal and shouldn’t the company known to assess the soil prior to dig?
Thanks in advance for any advice.
Here’s our pool design for those interested