Hello TFP
It is not going well with pool build. We are possible looking at sending a demand letter to our build due to lack of performance. Let me get up to speed. Project started 10/19/18, was told it was a 10 to 12 week job. We have been patient due to weather delays throughout the process. Without getting into all the nitty gritty details, lets just say this job has been handled poorly. We have our deck poured and the plaster was done on the 10th and pool was filled by late on the 11th. One week ago. Pump was not running until Monday. Still no chemicals except for something called Jacks Magic (I think) squirted from a bottle on Tuesday evening. The guy didn't wait for us to come out and talk to him and it was at about 8:30 at night. There are so many things that are unsatisfactory at this point the deck, the coping, expansion joint (or lack of) to name a few, but what I am really concerned about is the water chemistry and the pump performance. I want to add bleach and muriatic acid to at least sanitize and bring the Ph down. Its way off the chart using the K1000. The other issue is the pump (Jandy VS 1.65) seems way under powered and changes speed on its own. I think there is air in the lines. The tech did not seem to know what he was doing and told us the pump was self priming and to let it run full speed for a few days. If this is full power, then we were grossly misled. I have been brushing several times a day and trying to get debri off the bottom. The plaster looks really good for now, just concerned about the long term. We have reported these things to the PB and we get "Someone will be out this week". That was Monday night. Any advise would be much appreciated. And if I should post the chemical and pump issues in the respective forums, let me know.