New here and been lurking while working through an algae problem for the last 3-4 weeks.
Pool guy claimed no chlorine and started dumping mass liquid chlorine, cleaned filter, added Blue Ray XL (minerals in skimmer basket + cartridge in pump basket). Also added floater with tabs. Continued to brush walls and floor (msyelf) with pump/vacuum running most of the day.
Water is pretty clear now with stains left behind, mostly on steps and floor. Can't determine if left over algae or stains from minerals.
Had high CYA problem all last summer, but levels seem to be ok now. Bought my own testing and cleaning supplies because I couldn't trust what pool guy was telling me, stories never added up.
Still trying to figure out the K-2006C kit, but based on what I've been able to test - FC 10, CYA 30, PH 7.8
Thoughts on best ways to prevent this or if SLAM is needed? Find liquid chlorine or continue using tabs?
I also have a decent amount of evaporation as I need to top off/fill for 30 mins every 2-3 days. Wondering if that's normal?
I'm on the verge of just doing the work myself (since I have everything I need now) - last scheduled maintenance is this Friday.
Thanks in advance.
Pool guy claimed no chlorine and started dumping mass liquid chlorine, cleaned filter, added Blue Ray XL (minerals in skimmer basket + cartridge in pump basket). Also added floater with tabs. Continued to brush walls and floor (msyelf) with pump/vacuum running most of the day.
Water is pretty clear now with stains left behind, mostly on steps and floor. Can't determine if left over algae or stains from minerals.
Had high CYA problem all last summer, but levels seem to be ok now. Bought my own testing and cleaning supplies because I couldn't trust what pool guy was telling me, stories never added up.
Still trying to figure out the K-2006C kit, but based on what I've been able to test - FC 10, CYA 30, PH 7.8
Thoughts on best ways to prevent this or if SLAM is needed? Find liquid chlorine or continue using tabs?
I also have a decent amount of evaporation as I need to top off/fill for 30 mins every 2-3 days. Wondering if that's normal?
I'm on the verge of just doing the work myself (since I have everything I need now) - last scheduled maintenance is this Friday.
Thanks in advance.