New build progress - North Carolina

Jglass38

Member
Mar 29, 2022
23
North Carolina
Hi all! New here and excited about the new pool. We signed the contract in the winter with construction set to begin in March. Digging started on March 19. As of today, shotcrete is in and tile is coming up. The pool is 16x32 with a 8x10 tanning ledge and 9x9 spillover spa.
 

Attachments

  • IMG_6567 (Small).jpg
    IMG_6567 (Small).jpg
    97 KB · Views: 33
  • IMG_6568 (Small).jpg
    IMG_6568 (Small).jpg
    94 KB · Views: 31
  • IMG_6565 (Small).jpg
    IMG_6565 (Small).jpg
    95.9 KB · Views: 30
  • IMG_6566 (Small).jpg
    IMG_6566 (Small).jpg
    97.2 KB · Views: 31
  • IMG_6569 (Small).jpg
    IMG_6569 (Small).jpg
    97.9 KB · Views: 33
  • IMG_6570 (Small).jpg
    IMG_6570 (Small).jpg
    91.6 KB · Views: 34
  • Like
Reactions: BigPapaSmurf
Welcome to TFP.

Looks good so far. You a re moving along quicker then many folks here with your build.
 
  • Like
Reactions: Jglass38
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.