New build in Round Rock, TX...Dig, Rebar, Plumbing complete.

KBR

Member
Jul 14, 2020
15
Round Rock, TX
Well it was a good two month wait between signing the contract and getting HOA stuff done and then meeting with superintendent. Dig started on the 20th of July and things have progressed nicely since then. Plumbing wrapped up yesterday. We are going on vacation all next week so hoping the gunite is completed as a nice welcome home present.8C5B72B1-9F4E-4421-A372-68AB270A829A.jpeg
661B99F3-45C8-4FAD-AEBE-C0BE8306CA44.jpeg366FA733-43D8-4145-BCCE-A074E3EEA28A.jpeg6ACC1B80-4039-4B27-9C37-CC9EC2BB75A8.jpegA23DA12A-9021-4DDC-A8DA-AE7ECD82CF29.jpeg50CFC717-E87A-471D-BA53-5FF439ADC638.jpegBB32F633-4F78-489B-8E19-38B2195F7209.jpeg
 

KBR

Member
Jul 14, 2020
15
Round Rock, TX
Made some modifications to the selections. No more deco tile, just using the ledge stone on pillars and raised wall. Changed the coping to something a little lighter versus the ivory.

Decided to contract out the patio coating. The product is called Kool Stone which is like a stamped finish, but has the same reflective and cooling properties as the textured stuff. We haven’t picked out the colors yet, but the style is below.

7A460930-5DE2-471F-8483-6904FB463656.jpegFA4C8CA2-F405-4677-9837-179582265FC5.jpg
 