last pic of the steel and plumbing
equipment from the other side. They did not leave much room, plus I don't know what I'm going to put on the ground between the pad and the fence. any suggestions???????
Starting gunite!!!!!!!!!!!
deep end with water prior to the gunite:
the backing where the ground caved in:
working on the tanning ledge/1st step:
They finished the gunite yesterday, but I couldn't get any pictures as I didn't get home until after dark. They started the coping, rock veneer spa on the spa and water line tile. And got most of it finished today (it was an incredibly gorgeous day in Dallas today, about 75 degrees)
the deep end with gunite and still water:
just outside of the shallow end:
pic from the shallow end:
spa with coping that has only been dry fitted:
standing in the deep end looking back to shallow and spa:
Please let me know if you notice anything that I should be worried about.