Hi everyone.
Thank you for the wealth of information posted on TFP. I've learned so much in the past couple of months. After reading as many TFP posts as I could, I think I'm ready to get my own pool. I chose my PB yesterday and I'll be signing the contract very soon. If things go well, it'll be done by Christmas. Thanks for any feedback.
Thank you for the wealth of information posted on TFP. I've learned so much in the past couple of months. After reading as many TFP posts as I could, I think I'm ready to get my own pool. I chose my PB yesterday and I'll be signing the contract very soon. If things go well, it'll be done by Christmas. Thanks for any feedback.
- Pool Dimensions 24x40
- Pool Square Footage 741
- Pool Linear Footage 106
- Pool Depth 3.5 to 5ft
- Coping Type: Flagstone
- Install your choice of our standard 6" waterline tiles.
- Install Shamu Pad ledges, benches, and steps per plan. Shamu Pads come with an umbrella sleeve and two (2) bubbler fountains.
- Skimmers 2
- Pressure Tested Schedule 40 PVC Pipe
- Main Drains 2
- Returns 4
- Textured Concrete Decking 500 Square Feet with PVC Expansion Joints to Match the Concrete
- 4" CPVC Deck Drain Pipe 50 Linear Feet
- 8" Area Deck Drain 3
- Install a 24" high medium stacked rock raised bond beam with a safety grab ledge on the bottom of the raised bond beam.
- 4,000 PSI pneumatically applied concrete reinforced with a rebar cage tied 12" on center with a three row steel reinforced 12" bond beam.
- 18" Sheer Waterfall 3
- Bubblers 2
- Waterproof the pipe penetrations, light niches, and skimmer equalizer lines. Install fittings to match the interior finish on all of the pipes leading into the swimming pool.
- Install an exposed aggregate pebble interior finish. Pebble Tec, Pearl Matrix, or Satin Matrix
- Pentair Easy Touch 4 Function Automation System with Salt System IC60
- Pentair SUPERFLO Variable Speed 1.5 HP Pump
- Pentair/Sta-Rite Modular Media 500 Cartridge Filter
- Pentair Intellibrite 5G Color Changing LED Lights 3
- Install a bonding grid per your jurisdiction electrical code, bond the pool, wire in all included pool equipment and accessories.
- Sub Panel/Meter Tap
- Freeze Protector Circuit
- Backfill the pool and return the construction area to a rough grade and ready for your final landscaping grade.
- We will perform standard permitting for the project. Permitting will begin when the start date timeframe is determined, a contract is signed, deposit received, and survey/plat received. The customer will provide us with any required property plats/surveys.
- The project completion time will be 8-10 weeks and begins on the morning of excavation and ends when the pool is filling with water.