We are building our first pool (Cypress, TX) and the digging started last Tuesday. All went well after they got the bobcat unstuck. Day 2 was for the inground cleaning system plumbing. The weather took an unexpected change for the worse before they could finsh the steel. We got some light rain and they decided to do a flash coat of gunite to help the walls from caving in. Still more light rain while they finshed the steel. Then its been two days of steady light to heavy drizzle. The pool has filled up all the to the shallow end now and more rain is expected today. Monday is scheduled for the gunite. Any thing we should be worried about with all of the rain? If it doesn't cave in is it all good?




