My new pool build (Getting Close)
A lot of work has been done since my last posting. Unfortunately, most of it was on a retaining wall that had to be done before the decking.
The was the first time I've gone through the permitting process. It turned out to be much easier than I expected.
The concrete guy I selected was highly recommended by two neighbors one of which is in the construction industry. I was also able to see his work first hand. He was not the cheapest but with the good recommendations and the fact that he was able to do both the retaining wall as well as the decking, it was an easy choice.
This guy is amazing. I expanded the scope of work from the time he gave me a quote so made him a deal. My wife works for a building supply company and gets the concrete blocks for a huge discount. I asked the concrete guy how much he pays and it was a lot more than my wifes' cost. My proposition was that I will provide the blocks if he also builds a small wall extension across the back of my house to hide my side yard and dig about 150' of trench so I could run my electrical to my spa, BBQ island and patio cover. He agreed.
On the day that I expected the trenches would be dug, I went down to Home Depot and bought all the conduit. When I got home I dumped the conduit in the front yard but had to leave right away. The next day I came home from work planning to run the conduit but was very surprised that he has already done it and got it signed off by the city inspector.

In addition to this, he ran all my deck and planter drains and ran two pipes to each planter for irrigation and low voltage lighting. It doesn't stop there my friends. He also dug two 30" deep footings for my new 6X6 gate posts.
Here are a few pics. Don't forget you can view more by clicking on the photobucket link in an earlier post.