We signed a Contract in early August for an early October install of a fiberglass pool here in Ohio. The install was complete within two days. Took about ten additional days to get the
cantilever coping and pool decking poured. Still more to do with sealing of concrete, fencing, landscaping and closing of the pool in the coming weeks. But so far things have went pretty smooth. Still much to learn.
cantilever coping and pool decking poured. Still more to do with sealing of concrete, fencing, landscaping and closing of the pool in the coming weeks. But so far things have went pretty smooth. Still much to learn.
Attachments
-
CA36EFE3-EA95-47C9-AB37-093CA419019F.jpeg577.2 KB · Views: 40
-
2E97DD9D-3920-4CFF-B2C9-025EC74941E8.jpeg445.2 KB · Views: 40
-
1724B964-8D78-416E-9D0B-0E08E1FE3B1B.jpeg377.8 KB · Views: 46
-
B45DD197-2D08-42F4-9CDD-9FBD845DEE56.jpeg753.9 KB · Views: 46
-
7F9E90AE-EE57-4B65-BA77-641145441049.jpeg569 KB · Views: 47
-
EE0E1058-A874-4203-8495-2B136FB877B1.jpeg566.1 KB · Views: 48
-
2692A502-1CFB-42F7-A36A-9E9CA1A61C77.jpeg434.7 KB · Views: 46