We had our concrete deck poured yesterday and therefore could not test the water or add bleach while it was setting. The night before I added what I thought would be two days worth of bleach but when I checked it tonight the FC was all the way down to .5, well below the minimum of 3 for my cya level of 40. Was it exposed long enough to cause a problem or is one day too short for something to start brewing?