Hello,
I have a 27' round above ground pool. I ran a solar heater last year with a spare submersible pump which was an easy plumbing job. I now want to tie my solar heaters into my main plumbing loop so I don't have a submersible pump sitting in my pool and a return PVC sitting overtop the pool dumping back in.
My hardware:
Waterway Defender 140 Pump
Pentair FN60 Quad Cartridge Filter
Cirupool Core-55 SWG
Hayward GLC-2P-A Solar Pool Heating Control System with 3-Way Valve, Actuator and 2 PC Sensors
(20) FAFCO Papabear 24' x 4' Solar Heaters
I did a rough sketch of what I think it should look like. The sketch is literally the perspective of the real life pool placement of the pool, solar panels, skimmer, pump, swg, etc. I have a few questions that maybe some experts could chime in on.
1. Should I re-arrange the way I have my pump/filter/swg laid out? Maybe I should do the pump all the way on the right, then the filter, and swg, so the exit is closer to the solar panels?
2. Does my check valve placement make sense?
3. Do I even need checkvalves?
Any/all critique is appreciated.. I want to do this right seeing as the cost of pump/swg/filter unions is insane right now.

I have a 27' round above ground pool. I ran a solar heater last year with a spare submersible pump which was an easy plumbing job. I now want to tie my solar heaters into my main plumbing loop so I don't have a submersible pump sitting in my pool and a return PVC sitting overtop the pool dumping back in.
My hardware:
Waterway Defender 140 Pump
Pentair FN60 Quad Cartridge Filter
Cirupool Core-55 SWG
Hayward GLC-2P-A Solar Pool Heating Control System with 3-Way Valve, Actuator and 2 PC Sensors
(20) FAFCO Papabear 24' x 4' Solar Heaters
I did a rough sketch of what I think it should look like. The sketch is literally the perspective of the real life pool placement of the pool, solar panels, skimmer, pump, swg, etc. I have a few questions that maybe some experts could chime in on.
1. Should I re-arrange the way I have my pump/filter/swg laid out? Maybe I should do the pump all the way on the right, then the filter, and swg, so the exit is closer to the solar panels?
2. Does my check valve placement make sense?
3. Do I even need checkvalves?
Any/all critique is appreciated.. I want to do this right seeing as the cost of pump/swg/filter unions is insane right now.
