Has anyone had their installer take the high side of the slope and use that dirt to build up the low side without issues? It is a gradual slope, nothing major but I understand it is recommended to dig down the high side to level with the low side and not add dirt to level. This installer is the company recommended by the local pool store, does ton's of jobs. I asked them, aren't they concerned about settling and they said not at all, the equipment is packing everything down. I live in NJ, with rocky soil. Looking at a 15x30 or 18x33 oval.
Edited to add: The one side is probably just under 2 feet higher than the other side