Ok,.. 32x16x52 pool is up,. Ground was leveled, pool tarp down, 1/2” foam board, then gorilla pad. I have 12x12 concrete pavers for each leg support. I’m picking up a transit in the morning. Should I start with the lowest pavers as level and bring the others down? I’m not real sure how to use the transit. I’m reading and watching how to videos,... any tips will be greatly appreciated!
I will never install another ABG pool, ever!!?
I will never install another ABG pool, ever!!?