Annnnnndddd just like that we hit a wall. Yesterday the PB was out talking with the decking trade and there are a few large issues.
1) The stairs in the kitchen weren’t done correctly and the sides of the kitchen by the stairs were rebar’d and shot at an angle vs being completely square. So now they need to demo the stairs and the side of the kitchen to square everything up.
2) The PB doesn’t like the way the spa tile was installed and in his opinion the water won’t flow smoothly over the edges and the overall finish ia not very good. They are going to rip out all the spa tile and reinstall it.
They were supposed to be back today but no one showed up, assuming because of the holiday. Most likely will see some work continue next week.