Let the games begin...
I'm in Central NJ and just started our 24'x41' free form inground steel wall/vinyl liner install yesterday. I had an intex pool for about 4 years. Decided to take the plunge this year. Permits in my town took roughly 6 weeks (that's with engineer drawings etc).
Excavation is complete. Walls and plumbing going in on Saturday (looks like things will go quickly and then pause for inspections.)
I will update with full equipment list soon. Wanted to add some photos.
What do you guys do while waiting? I feel useless and impatient right now. Lol
This is the location before any work. Round area was old above ground intex pool location.
All treed removed and stumps ground down.
Excavation about to start.
Hole dug!
I'm in Central NJ and just started our 24'x41' free form inground steel wall/vinyl liner install yesterday. I had an intex pool for about 4 years. Decided to take the plunge this year. Permits in my town took roughly 6 weeks (that's with engineer drawings etc).
Excavation is complete. Walls and plumbing going in on Saturday (looks like things will go quickly and then pause for inspections.)
I will update with full equipment list soon. Wanted to add some photos.
What do you guys do while waiting? I feel useless and impatient right now. Lol
This is the location before any work. Round area was old above ground intex pool location.

All treed removed and stumps ground down.

Excavation about to start.

Hole dug!