I have asked the pool builder to stub out plumbing and electrical before they poured the deck because I want to add an outdoor kitchen in the future. The question is: how do I cover up the stub outs? I was thinking about using an NDS valve box and just pour the concrete decking around the box and making sure that the box lid is level with the deck. What do you think? Any other ideas?
Thx
-S
Thx
-S