Good afternoon everyone,
I would greatly appreciate your input and help.
We recent built an above ground pool 21ft round, steel walled.
The pool is built on compacted stone dust ~3-4" and is level or very close to.
We initially used sand as a base and filled it with a foot of water. There are foot prints all over it and my wife hates how it looks.
We picked up 1inch foam boards (pink ones - the "good ones" in terms of R value) And I ordered a foam cove.
Question is.
One I drain and remove the water.
Should I remove the sand completely before installing the foam pad? Or can I try and compact the sand and level it out a bit and put the foam on top?
What about the cove? Can I go onto of a sand base?
I want it stong and avoid additional work. Removing the sand will take a long time.
I would greatly appreciate your input and help.
We recent built an above ground pool 21ft round, steel walled.
The pool is built on compacted stone dust ~3-4" and is level or very close to.
We initially used sand as a base and filled it with a foot of water. There are foot prints all over it and my wife hates how it looks.
We picked up 1inch foam boards (pink ones - the "good ones" in terms of R value) And I ordered a foam cove.
Question is.
One I drain and remove the water.
Should I remove the sand completely before installing the foam pad? Or can I try and compact the sand and level it out a bit and put the foam on top?
What about the cove? Can I go onto of a sand base?
I want it stong and avoid additional work. Removing the sand will take a long time.