- Apr 27, 2018
- 150
- Pool Size
- 11000
- Surface
- Vinyl
- Chlorine
- Salt Water Generator
- SWG Type
- CircuPool Edge-25
Thanks to help here, I'm well on my way to a TFP! I've got a handle on the daily tasks, but have a couple of vacations coming up:
1) For Memorial Day, we'll be gone from around noon on Friday until around the same time Monday
2) We'll be gone 2.5 weeks later in the summer
Assume for the sake of argument that right before each of these events, pH and CH are in acceptable range, TA is around 80 and CYA is 40. FC is 5-7 and CC is zero.
For the shorter trip, can I just bring the FC up to shock level and let it burn down over the course of ~3 days? Should I cover the pool?
For the longer one, I imagine I'll need to use Trichlor. I do have a Hayward inline feeder that I think will hold up to 10 tablets. I have five, but can get more if needed. Is that the best route? Should I cover the pool? Should I raise it to shock level before I leave to provide some overhead? How many pucks for 17 days on an 11k gallon pool in Illinois?
1) For Memorial Day, we'll be gone from around noon on Friday until around the same time Monday
2) We'll be gone 2.5 weeks later in the summer
Assume for the sake of argument that right before each of these events, pH and CH are in acceptable range, TA is around 80 and CYA is 40. FC is 5-7 and CC is zero.
For the shorter trip, can I just bring the FC up to shock level and let it burn down over the course of ~3 days? Should I cover the pool?
For the longer one, I imagine I'll need to use Trichlor. I do have a Hayward inline feeder that I think will hold up to 10 tablets. I have five, but can get more if needed. Is that the best route? Should I cover the pool? Should I raise it to shock level before I leave to provide some overhead? How many pucks for 17 days on an 11k gallon pool in Illinois?