My current Pentair Pinnacle inlet centerline is 10.25".
The replacement pump inlet centerline (Intelliflow VSF) is 9.1".
The old pump is connected to the supply piping (1.5") through a male threaded couple (threads into the Pinnacle pump).
Is there any way to "drop" the supply line down 1.15 inches?
Lowering the supply manifold (replacing the piping, 2 ball shutoff valves, and a fairly new Jandy 4715 valve) seems like it will be a lot of work.