Hi. Concrete guys are coming tomorrow. But I have concerns. They came and installed rebar and wire mesh on top of filler for the concrete to lay over. However, from the filler to the mesh there are areas of 2 1/4 inches to 4 1/4 inches. How many inches should be between the filler and the wire mesh for a structurally sound concrete deck? We are having Sundek installed on top. Thank you for any help.