Hi All, how long would you say it should take a PB to create/produce scalable drawings for a gunnite pool that has already been poured? I’m in a situation where I have had to fire a PB after he lied about pulling permits and other stuff. Unfortunately the shell has already been poured but I’m now working to obtain proper permits and resume build with new people. A PB has taken measurements and is supposed to be creating a new set of drawings that will be submitted to the city. This started 2 weeks ago and I was under the impression it would move faster since the structure is already in place it just has to be drawn up. I feel it shouldn’t take this long. Every time I ask the guy about progress he says his designer is working on it. But I’m like geesh why is it taking so long, it’s just a plain 15x25 rectangle pool without any water features or spa. Am I being impatient?