I need to do a small plaster repair (delamination issue) where the a small 8-10 inch has popped off so I need to patch it.
I did not open the pool last year and I am opening my pool soon and the pool opening company cannot do plaster repairs right now so I was going to have them open the pool, drain the water but have someone else come and fix the plaster or do it myself with a pool patch kit.
My question is: Would it be advisable to keep the pool empty for around a week until I have the different crews in to the work?
I did not open the pool last year and I am opening my pool soon and the pool opening company cannot do plaster repairs right now so I was going to have them open the pool, drain the water but have someone else come and fix the plaster or do it myself with a pool patch kit.