We just had our pool dug and rebar is in. The grade is very high and our yard is kind of small to regrade to the height of the pool in one corner of our yard. Does anyone know how hard it would be to shoot the gunite so that the back wall anc the left wall of the pool sticks out of the ground some? Do they just hand form this or do they need to form something to shot up to to create a smooth backdrop to shot to? It’s the weekend and I won’t get an answer from our builder until Monday and it’s killing me to not know yet. Attached are some photos of the yard, plan and an inspiration photo. We like raw concrete and have a retaining wall against the house like that do we would be good with that as the finish but if we had to we could clad it also.