I have the 18' intex pool, now with the hayward widemouth..
I added a 1/2" hole about 3/4" above the pool full line.. and ran some small pvc down to the ground.. one day it rained quite a bit, up maybe 1" in the pool.. the pipe was indeed draining, but it took 8 hours just to go down a half inch.
I kept the hole small because when the kids are in with the splashing i didnt want the water rushing out.
Is there some other trick to this, or is this about as good as it gets given the circumstances?
Thanks in advance
I added a 1/2" hole about 3/4" above the pool full line.. and ran some small pvc down to the ground.. one day it rained quite a bit, up maybe 1" in the pool.. the pipe was indeed draining, but it took 8 hours just to go down a half inch.
I kept the hole small because when the kids are in with the splashing i didnt want the water rushing out.
Is there some other trick to this, or is this about as good as it gets given the circumstances?
Thanks in advance