My backyard has a slight grade to it. The back of the lot is about 27-28” below my existing patio (24 feet back). I’m planning on building a Gunite pool and decking such that the existing patio level will be the deck and coping level, so the top of the back of the pool will be about 28-30” above the existing grade.
I’ve had two builders say that I should get piers installed, but a third (coincidentally the one I plan on going with) say I don’t need it since the majority of the pool will be under grade level.
Should I push the third builder on getting piers? I’m out of my league here and my only data point is that there’s an inconsistency between PBs.
For what it’s worth, the third builder builds about 2x the volume as the first two combined.
Also I think the existing yard is mostly original dirt (not fill dirt) as there are several original trees.
I’ve had two builders say that I should get piers installed, but a third (coincidentally the one I plan on going with) say I don’t need it since the majority of the pool will be under grade level.
Should I push the third builder on getting piers? I’m out of my league here and my only data point is that there’s an inconsistency between PBs.
For what it’s worth, the third builder builds about 2x the volume as the first two combined.