I ran into a really bad stump during ground prep, and had a stump grinding service come out and grind it up for me - there is no way I could have done it myself.
The stump grinder brought the grade down a good 4 inches or so from everywhere else I have already leveled.
My question is this: do I need to bring the rest of the grade down again to meet this new low point from the stump grinder? Or can I fill it in?
I know that the pool must be set up on virgin soil - if I fill in the area that the grinder has brought down, will the pool "settle"?
Pictures attached.