Disconnecting pumps, filter, heater to pour new concrete equipment pad - any suggestions?

Coz

Silver Supporter
Jul 10, 2022
58
South Carolina
Pool Size
15000
Surface
Fiberglass
Chlorine
Salt Water Generator
SWG Type
Pentair Intellichlor IC-15
My pool equipment is spread across three plastic pads which sit on gravel and are horribly off level and sitting below grade. This afternoon I will be disconnecting all my equipment to pour a new concrete pad under my equipment. Any suggestions on:
  • water prep prior to disconnecting pumps and filtration
  • do's and don'ts moving storing equipment
  • anything else
I expect it to only be 2-3 days until everything is hooked back up, but hoping to avoid losing the pool to algae in that time frame.
Thanks
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.