- Jul 10, 2020
- 161
- Pool Size
- 20000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
This is my first season with a new gunite pool. We're still waiting on the new/custom Loop Lock cover which is to be installed Nov 7. With formal closing by a local pool company the following day. How do people deal with Automation for the off season, specifically for a Screenlogic user? Do people delete their schedules and re-create them when opening the pool? Is there a way to stop the schedules from running without removing them?
Right now I'm just running it for a period of time overnight when electricity is the least expensive and turning off the pump daily in the morning withthe Screenlogic app. I assume that there is a better/easier way to do this and then leave it off once the pool is closed.
Right now I'm just running it for a period of time overnight when electricity is the least expensive and turning off the pump daily in the morning withthe Screenlogic app. I assume that there is a better/easier way to do this and then leave it off once the pool is closed.