How does this look for a plan (I know these things change sometimes once you start)... I just want to be sure we are on the same page is all...
Thanks agn for helping me out... I did order the 2 three way valves (so far 7 2 way and 2 3 way Jandy Never Lube Valves) I also have the jets ont he way... all that is left is to dig and pick up the pile to put down.
Thanks agn for helping me out... I did order the 2 three way valves (so far 7 2 way and 2 3 way Jandy Never Lube Valves) I also have the jets ont he way... all that is left is to dig and pick up the pile to put down.