We decided to cover the pool this year this week BUT LEAVE THE EQUIPMENT RUNNING ....primarily because I have some travel coming up...and I don't want to fight the leaves when I get back, and once it gets colder (like now) we only use the Spa anyway.......I always hire a pool service to put the cover on and do the rest myself. ($150 per cover or remove)...We normally y keep the Jacuzzi spillover spa open longer, as long as we can before freeze, then close. Just normally cover it AFTER closing.
This is the first time I kept the pool "running" with the cover on. I did nothing before covering the main pool except run / remove the vac robot and brush the pool. I will blow the lines and drain filter pump, add the gizmos, plugs, etc...etc....with the cover on, much later. The returns are easy to get to by popping two or three of the spring anchors on the cover. The skimmer tops are not covered. So, really, nothing is in the way.
Before covering the pool I put the IC-40 SWG into Boost mode...I assume there will be a much lower demand for FC. And for sure, FC is high. I checked the pH and it's a bit high, but it's easy to add MA. Monitoring the water level is easy by viewing the skimmer(s) with the top off.
Before final close by blowing out the pipes / filter / pump I'll add 2 quarts Polyquart 60.
Am I missing anything? Is there a downside to covering the pool and leaving everything running for another month or two?

This is the first time I kept the pool "running" with the cover on. I did nothing before covering the main pool except run / remove the vac robot and brush the pool. I will blow the lines and drain filter pump, add the gizmos, plugs, etc...etc....with the cover on, much later. The returns are easy to get to by popping two or three of the spring anchors on the cover. The skimmer tops are not covered. So, really, nothing is in the way.
Before covering the pool I put the IC-40 SWG into Boost mode...I assume there will be a much lower demand for FC. And for sure, FC is high. I checked the pH and it's a bit high, but it's easy to add MA. Monitoring the water level is easy by viewing the skimmer(s) with the top off.
Before final close by blowing out the pipes / filter / pump I'll add 2 quarts Polyquart 60.
Am I missing anything? Is there a downside to covering the pool and leaving everything running for another month or two?
