Hi Everyone,
I bought the Confer Curve steps and hoping someone can help me out. I heard that they are hard to hold down so I left all the caps off so all the voids can fill with water. I bought two HD smaller buckets and filled them with 24Kg of sand. I now have 4x 3"x19" tubes I am going to mount to the inside for a total of 45-50kg of sand.
1) How did people strap the PVC piping?
2) Is the PVC glue safe? I cleaned it up as much as I could
3) IS this enough sand?
How did you connect your PVC weights?
Thank You
Terry
I bought the Confer Curve steps and hoping someone can help me out. I heard that they are hard to hold down so I left all the caps off so all the voids can fill with water. I bought two HD smaller buckets and filled them with 24Kg of sand. I now have 4x 3"x19" tubes I am going to mount to the inside for a total of 45-50kg of sand.
1) How did people strap the PVC piping?
2) Is the PVC glue safe? I cleaned it up as much as I could
3) IS this enough sand?
How did you connect your PVC weights?
Thank You
Terry