- Apr 25, 2016
- 78
- Pool Size
- 25000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
I know people like to wait until their water temp is 60 or below but in Oklahoma that might not be until December. I have trees and I like to close before the leaves all end up in the pool. I have a safety cover and I bring the pool up to slam level before closing. When I open in the spring I still have chlorine in the water, usually around 8-10 ppm. We rarely get a hard freeze that lasts very long and I know some people here leave their pool running all year but due to the long hot summers I am ready for a break from pool maintenance by the time October rolls around. The point is, I don’t think that it’s necessary to wait for a certain water temp before closing. Does anyone agree or disagree with my method?