98Landry,
Leakage is at the socket. My motor is rated 1 ph if I read it correctly. I don't know if there is enough room for me to install two seperate valves in the future. I will have to take some measurement and lay this out according.
My plan for tomorrow is to cut 2"-3" below the socket, take whole assembly to pool supplies store and get right size coupling, union, pvc glue, straight pipe and this done and over with. Thus far three days and counting...
Leakage is at the socket. My motor is rated 1 ph if I read it correctly. I don't know if there is enough room for me to install two seperate valves in the future. I will have to take some measurement and lay this out according.
My plan for tomorrow is to cut 2"-3" below the socket, take whole assembly to pool supplies store and get right size coupling, union, pvc glue, straight pipe and this done and over with. Thus far three days and counting...