I have a new pool and will be following the guidelines on your website. I need to add liquid chlorine, CYA and muriatic acid. I plan on adding enough muriatic acid to bring the PH level down to 7.2. I understand that fixing the TA issue will take time. My question is can I add the chlorine, CYA and muriatic acid in the same day? I was thinking one chemical every 30 minutes. Or do I need to tackle the issues in a specific order over a longer time period. Here are the current test results:
FC……0.3 ppm
CC….. 0
PH…….8.2
TA…….340
CH……180
CYA….0
thanks
FC……0.3 ppm
CC….. 0
PH…….8.2
TA…….340
CH……180
CYA….0
thanks