We are owner builders of our pool and having a couple questions. We are scheduled for shotcrete in 5 days.
1) Can the rebar tie wires stick out or should we bend all of them in? (See attached pic). In our area (AZ) we need 3” shotcrete above and below.
2) An area of about 3’ by 4’ (we enlarged our tanning ledge) needs to be filled with shotcrete as we changed layout a bit. Should we pound some rebar down into the ground to give a little more support? Can you fill in all that area with shotcrete or is it too large of an area?
1) Can the rebar tie wires stick out or should we bend all of them in? (See attached pic). In our area (AZ) we need 3” shotcrete above and below.
2) An area of about 3’ by 4’ (we enlarged our tanning ledge) needs to be filled with shotcrete as we changed layout a bit. Should we pound some rebar down into the ground to give a little more support? Can you fill in all that area with shotcrete or is it too large of an area?