I’ve had two contractors try to level my ground for me. They both tried to say the job was done and take payment before it was really done. It’s a long story but basically I paid the second guy because I thought the job was done, started to set up my pool, and now I see that one corner is 1.5” high.
How bad would it be if I dragged the empty pool off the high spot, leveled the ground, then dragged it back?
I have tarps I can spread on the ground so the liner won’t drag directly on the ground.
I’m trying to avoid taking the pool apart a second time and setting it up again a third time…
How bad would it be if I dragged the empty pool off the high spot, leveled the ground, then dragged it back?
I have tarps I can spread on the ground so the liner won’t drag directly on the ground.
I’m trying to avoid taking the pool apart a second time and setting it up again a third time…