I got around to starting the replacement this morning and the replacement part is only 1/2" taller than the one I already had .... 30" vs. 29.5" ...
Not sure what to make of that.
Anyway, to make sure I get this installed correctly, I think I've gathered that once I've set the new lateral assembly I need to:
-Add some water to the filter
-Add back the sand
-Re-install the multi-port valve
-Do a full backwash and rinse cycle
Anything else I need to pay attention to?? Thanks.