Our contract states that the pool will be completed in 90 days. We will be at 90 days the day after thanksgiving. At the 90 day mark we will have just finished Shotcrete, plumbing and the wood support will be in place for our poured in place concrete coping. We have documented 12 working days of "downtime" days where nobody was working on our pool. We have also have several "1/2 days" an hour or two of work. They do not work on Sat. or Sun.
We still need drains, masonry work, tile, ledgerstone, banding, decking, electric, pool equip. the rebuilding of a wall, sprinkers, lighting and pebble to be installed.
We had 1 day of rain and lost a day as we hit water.
I want to be fair and reasonable with our PB as he is doing a quality, but slow job building our pool.
How should I address this and what should I expect? Should I start docking him from the ballon payment at the end of the build?
Love to hear both side consumer and people in the industry. Thanks!
We still need drains, masonry work, tile, ledgerstone, banding, decking, electric, pool equip. the rebuilding of a wall, sprinkers, lighting and pebble to be installed.
We had 1 day of rain and lost a day as we hit water.
I want to be fair and reasonable with our PB as he is doing a quality, but slow job building our pool.
How should I address this and what should I expect? Should I start docking him from the ballon payment at the end of the build?
Love to hear both side consumer and people in the industry. Thanks!