- Jan 16, 2017
- 169
- Pool Size
- 26000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Autopilot Digital PPC4 (RC-52)
Can I add water to raise my water level at the start of a SLAM process? My water level is below the halfway mark of the skimmers. I want to get all the yellow algae I have by ensuring the tiles are at least halfway in the water. Is that necessary? FC PPM is already at 25 with CYA at 70. All other values are in range. TA might be a bit high at 110.
Last edited: