So I'm assembling my top rail on my oval pool. I start with the straight side, no problems. I go to attach the first top rail on the curved side, and the hole alignment has me concerned. The instructions say 4 screws per top rail, 2 per side. The outer hole on each side is no problem. The inner hole lines up exactly over the top of the top rail stabilizer.
Is this normal? Do you screw through the top rail, through the top plate, and into the top rail stabilizer? I'm slightly concerned this might puncture the liner....
Is this normal? Do you screw through the top rail, through the top plate, and into the top rail stabilizer? I'm slightly concerned this might puncture the liner....