I've been reading the forum for a few years and finally decided to pull the trigger and move forward with our gunite inground pool.
Specs:
35X15 with 15X5 tan ledge and 6X2 swim out love seat
3.5' - 7.5' deep
jump rock
Pentair equipment with heater and VS pump
Dig Date: 3/30/15
Plumbing: 4/2/15
Rebar: 4/6/15
Gunite: 4/8/15
So far the build is going OK. Our PB is a large reputable builder but isn't very good at communicating scheduling changes. They also don't supervise their subs. We had a few days where subs just didn't show and no one let us know. We made a few last minute changes to the plans before the dig and the PB didn't pass them on to the gunite crew. If I didn't mention them, the pool may have been built incorrectly. Luckily my OCD didn't allow this to happen
Our gunite was shot in the rain which made me nervous but they insist it is OK. I posted some pictures and wanted some feedback on the gunite..... Thanks in advance...
View attachment 35198View attachment 35199View attachment 35200View attachment 35201View attachment 35202
Specs:
35X15 with 15X5 tan ledge and 6X2 swim out love seat
3.5' - 7.5' deep
jump rock
Pentair equipment with heater and VS pump
Dig Date: 3/30/15
Plumbing: 4/2/15
Rebar: 4/6/15
Gunite: 4/8/15
So far the build is going OK. Our PB is a large reputable builder but isn't very good at communicating scheduling changes. They also don't supervise their subs. We had a few days where subs just didn't show and no one let us know. We made a few last minute changes to the plans before the dig and the PB didn't pass them on to the gunite crew. If I didn't mention them, the pool may have been built incorrectly. Luckily my OCD didn't allow this to happen
Our gunite was shot in the rain which made me nervous but they insist it is OK. I posted some pictures and wanted some feedback on the gunite..... Thanks in advance...
View attachment 35198View attachment 35199View attachment 35200View attachment 35201View attachment 35202