We contracted with a local pool builder and he short-changed us by 112 SF (15%) of the 750 SF for which we had contracted. He was going to expand the pool in the shallow end this fall but due to financial issues asked to do the expansion next fall, 2015 with a subsequent plastering in Spring 2016.
There are many other issues,but this is the gist. I have a structural engineer who drafted designs for the expansion, but I've now heard from several other folks who suggested that this might not be the best idea in my part of the country (northeast). Any thoughts or guidance?