I am wanting to pour a concrete deck on one side of a buried doughboy pool, level with the top rail cap. Can i just have my concrete person pour the concrete up to the cap, but not under the cap, so that when the cap is removed there is 4 inches or so of space between concrete and pool for liner changes in the future? If not, how close to the pool can I come?
thanks!
thanks!