Today I am meeting with the builder to nail down our final design. Here is a picture I drew up after putting a hose in my yard to get a better feel for the space. Is there anything that I am missing?
2nd, I know this is asked as nauseum...but what is a good depth for jumping? In the far curve, we are planning on having a deeper end for jumping feet first into. Is 6 feet deep enough? Or should we do 6.5 or 7? Trying to keep as much shallower area (3.5-4.5) to play. We have a 2 tiered tanning ledge (or a really big second step) to accommodate a chair for my special needs son...so that already takes up a good chunk of shallow area. Anyways, let me know of you guys have any suggestions!
Sent from my iPhone using Tapatalk
2nd, I know this is asked as nauseum...but what is a good depth for jumping? In the far curve, we are planning on having a deeper end for jumping feet first into. Is 6 feet deep enough? Or should we do 6.5 or 7? Trying to keep as much shallower area (3.5-4.5) to play. We have a 2 tiered tanning ledge (or a really big second step) to accommodate a chair for my special needs son...so that already takes up a good chunk of shallow area. Anyways, let me know of you guys have any suggestions!
Sent from my iPhone using Tapatalk