All-
We're gearing up to have a resurface with new tile and coping installed. We've got an area of steps that we're turning into a bit of a sundeck and pushing the steps out, as well as filling in a spa to create a secondary sundeck as well. The contractor we're pretty much decided on wants to use gunite (half of the bids we got would use gunite)- we're going to be paying a flat fee for a gunite truck to roll out, and we've got lots of "leftover" gunite allocated that we're trying to figure out if there's anything we could do with it... so the question is, what would YOU do? Are rock forms an option? Could I frame out an equipment pad for them to fill in (everyhting's sitting on pavers right now)?
Thanks!
We're gearing up to have a resurface with new tile and coping installed. We've got an area of steps that we're turning into a bit of a sundeck and pushing the steps out, as well as filling in a spa to create a secondary sundeck as well. The contractor we're pretty much decided on wants to use gunite (half of the bids we got would use gunite)- we're going to be paying a flat fee for a gunite truck to roll out, and we've got lots of "leftover" gunite allocated that we're trying to figure out if there's anything we could do with it... so the question is, what would YOU do? Are rock forms an option? Could I frame out an equipment pad for them to fill in (everyhting's sitting on pavers right now)?
Thanks!