hey all -
on the tail end of my liner installation, liner is in from intheswim.com. have almost all of my gaskets, waiting for one.
What i can seem to figure out is the best way to keep my gaskets in place when im installing the liner, mostly worried about my main drain and my light niche rubber gaskets. One article recommended rubber cement for the light, and screwing two screws into the main drain gaskets on opposing sides before the liner drops. Only problem with that plan I dont see any way to get those screws out when im working from the top side, im guessing theyre assuming 2 is enough.
The stairs im not so worried about because gaskets came with adhesive on them, but there are no holes obviously, so im not quite sure yet how im going to line up my screws into the existing holes in the FG stairs. when i put the plastic plate on the liner side i hypothetically i guess it would line everything up into the old holes.......
excuse the pun but any holes in my plan?
on the tail end of my liner installation, liner is in from intheswim.com. have almost all of my gaskets, waiting for one.
What i can seem to figure out is the best way to keep my gaskets in place when im installing the liner, mostly worried about my main drain and my light niche rubber gaskets. One article recommended rubber cement for the light, and screwing two screws into the main drain gaskets on opposing sides before the liner drops. Only problem with that plan I dont see any way to get those screws out when im working from the top side, im guessing theyre assuming 2 is enough.
The stairs im not so worried about because gaskets came with adhesive on them, but there are no holes obviously, so im not quite sure yet how im going to line up my screws into the existing holes in the FG stairs. when i put the plastic plate on the liner side i hypothetically i guess it would line everything up into the old holes.......
excuse the pun but any holes in my plan?