We are realizing the 400 sq feet the builder provides is not enough decking. We were quoted 8 sq foot for stamped concrete. Does that sound about right? We are looking at 300 extra square feet...ouch.
momoffourbabes said:We are realizing the 400 sq feet the builder provides is not enough decking. We were quoted 8 sq foot for stamped concrete. Does that sound about right? We are looking at 300 extra square feet...ouch.
toofast said:If using fill, it must sit for a long time (3-4 months IMHO) to minimize shift
Killer95Stang said:toofast said:If using fill, it must sit for a long time (3-4 months IMHO) to minimize shift
How many people are going to wait 4 months after the pool is done to pour the deck? They build skyscrapers in shorter periods of time.