Hi Guys,
I'm a long time lurker on this site and this is my first post. Firstly, I just wanted to thank everyone for their valuable contributions and the sponsors for maintaining such a great database of information. After many months of research and reviews my family and I just ordered our above ground pool package. To say we are excited is an understatement!
It is as follows:
(Raypak C-R406A Commercial Natural Gas Heater)
(Hayward SP3400VSP Ecostar Variable Speed Pump)
(Hayward C7030 Cartridge Filter)
(Hayward AQ-RT PRO 40 Salt System)
(2 Doughboy Skimmer Kits)
(2 Additional Returns 4 Total)
(2.5" Plumbing With Reducers For The Skimmers & Returns)
(Blue White Flow Meters)
(Hayward Manual Ball Valves)
(Pool Cove Kit)
(16mil 21'x41' Clear Solar Cover)
(Heavy Duty Inground Solar Cover Reel Deck Mount)
(Doughboy 21' x 41' Autumn Breeze Oval with Blue Bayou Expandable Liner)
We will be doing the entire site prep and install ourselves. The expected delivery date for the equipment is July 1st. I've got six weeks off to get it finished and will update the build process with pictures each night. Hopefully, someone will find them as useful as I have found this site.
Cheers,
Chris
I'm a long time lurker on this site and this is my first post. Firstly, I just wanted to thank everyone for their valuable contributions and the sponsors for maintaining such a great database of information. After many months of research and reviews my family and I just ordered our above ground pool package. To say we are excited is an understatement!
It is as follows:
(Raypak C-R406A Commercial Natural Gas Heater)
(Hayward SP3400VSP Ecostar Variable Speed Pump)
(Hayward C7030 Cartridge Filter)
(Hayward AQ-RT PRO 40 Salt System)
(2 Doughboy Skimmer Kits)
(2 Additional Returns 4 Total)
(2.5" Plumbing With Reducers For The Skimmers & Returns)
(Blue White Flow Meters)
(Hayward Manual Ball Valves)
(Pool Cove Kit)
(16mil 21'x41' Clear Solar Cover)
(Heavy Duty Inground Solar Cover Reel Deck Mount)
(Doughboy 21' x 41' Autumn Breeze Oval with Blue Bayou Expandable Liner)
We will be doing the entire site prep and install ourselves. The expected delivery date for the equipment is July 1st. I've got six weeks off to get it finished and will update the build process with pictures each night. Hopefully, someone will find them as useful as I have found this site.
Cheers,
Chris