Now that my pool is winterized I have some changes to make. I want to hard plumb it and bond it. I know how to bond it and have all the stuff. However, I need to know some things before I hard plumb.
Other than the straight schedule 40 1.5" pipe, 45 and 90 degree pieces, the PVC cleaner and glue, and 4 unions, do I need anything else? My bonding is going through the skimmer and all I have is the pump and filter, no heater.
I also plan to move my pump/filter from its current location to the side of my house. The distance is less than 20 feet.
Any advice?
Other than the straight schedule 40 1.5" pipe, 45 and 90 degree pieces, the PVC cleaner and glue, and 4 unions, do I need anything else? My bonding is going through the skimmer and all I have is the pump and filter, no heater.
I also plan to move my pump/filter from its current location to the side of my house. The distance is less than 20 feet.
Any advice?